Catch Basin Repair
Ensure proper drainage on your property with our catch basin repair services. We fix and maintain catch basins to prevent water accumulation and damage.
CATCH BASIN CLEANING TORONTO
At MAYDONE, we collaborate with numerous commercial clients to offer comprehensive catch basin cleaning services. Our fleet, equipped with pumping and flushing vehicles, can handle everything from underground apartment parking basins to outdoor mall basins. Owning all our vehicles, we are frequently sought after for our expertise and equipment by other local plumbers. We are the preferred choice in the GTA for commercial catch basin cleaning in Toronto. Additionally, our in-house team excels in services such as hydro jetting and backflow preventer installation and testing.
HOW DOES A CATCH BASIN CLOG?
Catch basins are designed to collect leaves, dirt, and debris carried by rain runoff, preventing these materials from entering the outlet pipe and causing overflow during heavy rain.

Clogs can occur when smaller items like food wrappers, plastics, litter, and dirt get washed into the basin. Over time, these materials can build up, blocking the connection to the sewer and preventing water from draining, which leads to overflow.

Another common cause of catch basin clogs is insufficient maintenance. Without regular cleaning, clogs can cause water to flood the surrounding area, posing health and safety risks for vehicles and pedestrians. To prevent injuries caused by negligence, scheduling regular preventative maintenance is crucial. MAYDONE recommends that businesses clean their catch basins at least every two years.
Catch Basin Repair Process
1
Excavation and Removal:
Saw cutting is performed around the catch basin, and the damaged asphalt is removed.
The area is excavated, and any broken modulock rings or pup sections are taken out.
2
Installation and Adjustment:
New pup sections are installed as needed.
To raise the catch basin to the correct elevation for effective drainage, 2″ or 3″ modulock rings are added on top of the structure as necessary.
3
Filling and Compaction:
The excavation is filled with suitable existing and new granular base material, which is then compacted to prevent settlement.
Additional gravel is added and graded to set the final granular grade.
The dirt and gravel are finally compacted in preparation for paving.
4
Re-installation and Paving:
The original or new catch basin frame and grate is re-installed.
A base asphalt layer is placed, graded, and compacted to 2 inches below the final elevation to allow for the top layer of asphalt.
The top layer of asphalt is then paved, ensuring effective water flow to the catch basin and into the drainage system.